Water Tecnik latest project consisted of a 125m3/hr DAF treatment system with integrated chemical mixing tanks.
The unit pictured below has a capacity of 125m3 per hour & was designed & built at our Newry factory.

Transport from Water Tecnik to Dale farm Cookstown on 10 April 2018 was contracted by specialist heavy haulage contractors at 9:45, just after rush hour!

It will treat the effluent from Dale Farms largest dairy, helping to pre-treat the factory’s effluent to a standard which will be finally discharged to river.

Full case study coming soon!
Read our current case studies to find out more about our clients!